A55, North Wales – IKO Pacopatch

Project description

The A55 North Wales from Chester to Caernarvon is a very busy trunk road, which takes a constant stream of heavy goods vehicles to and from the sea port of Holyhead, as well as local and industrial traffic. At weekends and during the summer months, the A55 also carries a considerable amount of holiday traffic making for the Welsh coast.

The government’s Design Manual for Roads and Bridges HA104/02 recently indicated that the premature failure of chamber and gulley ironworks installation currently placed in the UK’s highways network is a major contributory factor to the annual maintenance budget. Some £250m is swallowed up in this area alone.

Photo of the A55, North Wales IKO Pacopatch system
Photo of the A55, North Wales IKO Pacopatch system

Road surfaces around ironworks are subject to immense stresses and this makes them particularly vulnerable to damage. The high levels of traffic had led to the A55 road experiencing degradation of its ironworks. A series of manholes were therefore in urgent need of reinstatement as the existing internal metal frames were worn out.

Part of this major highway including three major road tunnels, the Conwy, Pen Y Clip and the Penmaenbach, is the responsibility of the Conwy County Borough Highways Department. These ironwork repairs had to be carried out about every two years; with some repairs only lasting 18 months and this was proving costly.

Clearly this issue had to be addressed using the most advanced method of ironwork bedding compounds. Conwy have tried several proprietary systems such as Polyester, Epoxy and Polyuride Resins, all with limited success to date.

The client required new manholes to be installed and insisted on a product that would have a long life expectancy. The solution was found in the IKO Pacopatch Ironworks Reinstatement System.

Photo of the A55, North Wales IKO Pacopatch system
Photo of the A55, North Wales IKO Pacopatch system

IKO Pacopatch is a versatile waterproof road repair system. It provides high bond strength to a variety of materials, and installation techniques that suit working in small sections. The ability to accommodate differential movement makes IKO Pacopatch an ideal material for the reinstatement highway iron works.

IKO approved contractor and highway repair specialist, RAB Associates (UK) Ltd, removed the cast iron cover and frames, and removed residual material such as loosened brickwork. The surrounding distressed road surfacing was also removed.

Then, using IKO Pacopatch Compounds, the re-bedding to match adjacent levels of the previous items was quickly completed. The repair was finished using IKO Pacopatch and pre-coated high PSV chippings to fill the surrounding void to match the existing road levels.

The highways engineer and his inspectors liked the IKO Pacopatch Ironwork Repair system because it was quick to install, with shorter shut down periods than planned.

The peace of mind of a five-year guarantee and BBA HAPAS certification for Inlaid Crack Repairs, were also important to them.

Andrew Skipper

Director of RAB Associates

“We believe that IKO Pacopatch provided the most cost effective and long term solution available on the market offering local authorities and Highways Agencies an unparalleled combination of whole-life costing and long term structural integrity.”