IKO Permatrack bridge surfacing system
Photo gallery of an IKO Permatrack bridge surfacing system – image 1 Photo gallery of an IKO Permatrack bridge surfacing system – image 2 Photo
Photo gallery of an IKO Permatrack bridge surfacing system – image 1 Photo gallery of an IKO Permatrack bridge surfacing system – image 2 Photo
The bridge was closed in September 2016 for three months while necessary repairs were made to the lifting sections, walkways and approaches.
The Ouse Swing Bridge was built as part of the Selby Bypass and was eventually opened in 2005. Ten years on, re-surfacing of the bridge was required.
Thank you for visiting us at the HAUC Convention 2024 THANK YOU FOR VISITING US AT THE HAUC CONVENTION 2024 THANK YOU FOR VISITING US
Highways & civils (IKO Road) systems Contact us Call 01257 255771 Technical support The IKO Road portfolio offers high performing bituminous road surfacing and repair
All too often, road repairs are let down by the use of products that fail to offer the longevity required. Polymer modified Mastic Asphalt addresses
Specification systems Specification Systems Specification systems Specification systems Specification Systems Specification systems Contact us CALL 01257 255771 Technical support IKO specification systems are detailed solutions
Chiswick Flyover is situated at the end of the M4, joining the motorway to the A4, a main arterial route carrying thousands of vehicles into Central London each day.