Search
Search
Search

M4 Junctions 5-7 – IKO Permatrack H

M4 Junctions 5-7 – IKO Permatrack H system

M4 junctions 5-7 is a composite pavement with the construction being made up of 190mm of wet-mix at the base overlaid with 140mm of bituminous surfacing.

Market Harborough – IKO Pacopatch

Photo of the Market Harborough IKO Pacopatch system

A failed manhole near a residential area in Market Harborough needed to be reinstated. Leicestershire County Council required a long-lasting road ironwork reinstatement solution that could be installed right first time.

Marks & Spencer, Matlock – IKO Permapark

Photo of Marks & Spencer, Matlock

Approached by Caces Consulting to provide a solution to strip and replace failed asphalt coverings. The store was having a full refurbishment by Marks and Spencer as it had recently had a change of ownership.

National Grid HQ Car Park, Warwick – IKO Permapark

Photo of the National Grid HQ Car Park, Warwick IKO Permapark system

The National Grid required a solution to a long-standing problem. The main car park at their HQ in Warwick had been leaking for a number of years. Various systems had been employed to tackle this issue; however, all had failed.

Plot 700 Winnersh Triangle – IKO Permaphalt

Photo of the Plot 700 Winnersh Triangle IKO Permaphalt system

This project was a new build, where the main contractor specified the need to house a roof/plant room area at the top of a new office block. This required a robust, waterproof roofing solution.

Round Tower, Portsmouth – IKO Permaphalt

Photo of the Round Tower, Portsmouth IKO Permaphalt system

The Round Tower (dating back to the 1400’s) is a fortification at the entrance to Portsmouth harbour. A Grade I listed building that sits (actually overhangs) the Portsmouth sea front and is susceptible to all types of coastal weather.

Royal Hotel, Lancaster – IKO Permapark

Photo of the Royal Hotel, Lancaster IKO Permapark system

Phase 1 of the car park installation was above the popular ballroom which is a highly sensitive area due to the number of functions that are held throughout the year. The ballroom also consists of a number of very large chandeliers which are fixed to large metal plates above the ceiling directly below the installation area.

St Paul’s Cathedral, London – IKO Permaphalt

Photo of the St Paul’s Cathedral, London IKO Permaphalt system

Sussex Asphalte renewed the asphalt to St Paul’s Cathedral Stone Gallery replacing asphalt laid in 1906 (416m2). At 53m the Gallery’s exposure to the elements and surface deterioration caused water ingress damaging artwork inside the Dome.

The Oval, Doncaster – IKO Permaphalt

Photo of The Oval, Doncaster IKO Permaphalt walkway system

IKO PLC was contracted to work alongside ENGIE, John Hill Associates, and Tucker Tunstalls to provide important waterproofing and slip-resistant solutions for The Oval in Conisbrough using their mastic asphalt solutions.