M4 Chiswick Flyover, London – IKO Permatrack H

Chiswick Flyover is situated at the end of the M4, joining the motorway to the A4, a main arterial route carrying thousands of vehicles into Central London each day.
M4 Junctions 5-7 – IKO Permatrack H

M4 junctions 5-7 is a composite pavement with the construction being made up of 190mm of wet-mix at the base overlaid with 140mm of bituminous surfacing.
Market Harborough – IKO Pacopatch

A failed manhole near a residential area in Market Harborough needed to be reinstated. Leicestershire County Council required a long-lasting road ironwork reinstatement solution that could be installed right first time.
Marks & Spencer, Matlock – IKO Permapark

Approached by Caces Consulting to provide a solution to strip and replace failed asphalt coverings. The store was having a full refurbishment by Marks and Spencer as it had recently had a change of ownership.
National Grid HQ Car Park, Warwick – IKO Permapark

The National Grid required a solution to a long-standing problem. The main car park at their HQ in Warwick had been leaking for a number of years. Various systems had been employed to tackle this issue; however, all had failed.
Plot 700 Winnersh Triangle – IKO Permaphalt

This project was a new build, where the main contractor specified the need to house a roof/plant room area at the top of a new office block. This required a robust, waterproof roofing solution.
Round Tower, Portsmouth – IKO Permaphalt

The Round Tower (dating back to the 1400’s) is a fortification at the entrance to Portsmouth harbour. A Grade I listed building that sits (actually overhangs) the Portsmouth sea front and is susceptible to all types of coastal weather.
Royal Hotel, Lancaster – IKO Permapark

Phase 1 of the car park installation was above the popular ballroom which is a highly sensitive area due to the number of functions that are held throughout the year. The ballroom also consists of a number of very large chandeliers which are fixed to large metal plates above the ceiling directly below the installation area.
Sainsbury Car Park, Orpington, South London – IKO Permapark

IKO Permapark has been used to refurbish a 4,000 sq m Sainsbury’s car park in Orpington, South London, which has offset more than 60 tonnes of CO2 emissions.