The Pavillions, Bristol – IKO Ultra Prevent

The Pavillions in Bristol has undergone a major refurbishment to modernise the offices and facilities on site to create a vibrant and attractive office environment.
Wythenshawe Hospital – IKO ULTRA Prevent

The IKO ULTRA Prevent 25 system was chosen for a comprehensive healthcare roofing refurbishment across 13,000m² at Wythenshawe Hospital.
Ysgol Greenhill School, Tenby – IKO Ultra Prevent

Ysgol Greenhill School is a secondary school in the coastal town of Tenby, Pembrokeshire. With approximately 1200 pupils on roll, it is one of the largest secondary schools in Wales. The roofs identified were suffering from several problems making refurbishment a high priority.
Bede Primary School & Community Centre, Gateshead – IKO Mach Two

Gateshead Council is committed to raising educational standards and achievement throughout the Borough. There have been tremendous improvements made over the last few years and they want to continue this process by creating inspirational 21st century learning environments in all their schools.
Hodge Clough Junior School, Oldham

The roofing industry’s first ever public sector partnership deal led by a roofing system manufacturer was appointed to IKO PLC by Oldham Metropolitan Borough Council in 2003.
The benefits of IKO Carrara – the air purifying roofing membrane
https://youtu.be/eNBcrlBCCW0 IKO Carrara is an innovative, ecological roofing membrane combining all known technologies for the improvement of the environment. To reduce extremely damaging, so-called secondary particle matter in the air, IKO Carrara brings together many different innovations to create ‘Air Care Technology’.
Bletchley Park, Milton Keynes – IKO Ultra Prevent

The historic Bletchley Park flat roof blocks A, B, and E required re-roofing and upgrading with insulation. The design brief was to de-chip and overlay the roofs, thus minimising disturbance to the substrate.
Airbus, Stevenage – IKO Mach Two

Airbus PLC required a completely flame-free installed system. Improvement was necessary to improve roof and gutter surface water clearance. The head office provided a challenge due to the amount of roof mounted pipework. Due to the housing of sensitive contents – vibration and noise as well as disruption had to be kept at a minimum.
Clongowes Wood College Swimming Pool – IKO Carrara

The Clongowes Wood College Swimming Pool roof was in need of repair but required a more innovative approach to make it both kind to the environment and also lightweight. An IKO Carrara roofing system was chosen due to the environmental credentials such as: