Hull University, Yorkshire – IKO Armourplan P
Phase one of the new Westfield Court student accommodation at the University of Hull has reached completion with residents having moved in on 15 September 2018.
Phase one of the new Westfield Court student accommodation at the University of Hull has reached completion with residents having moved in on 15 September 2018.
IKO PLC was contracted to work alongside ENGIE, John Hill Associates, and Tucker Tunstalls to provide important waterproofing and slip-resistant solutions for The Oval in Conisbrough using their mastic asphalt solutions.
Located in the heart of Scarborough, North Yorkshire, Brunswick Shopping Centre offers shoppers over 30 shops under one roof. The shopping centre has an annual footfall of approximately 7 million people and offers on-site car parking split over two levels.
The existing waterproofing had failed due to a previous poor installation, the result of which saturated the insulation below the exterior roofing. New high performance solutions were specified that included a range of IKO roofing waterproofing systems to protect both the flat and pitched roofing areas of the building.
The Pavillions in Bristol has undergone a major refurbishment to modernise the offices and facilities on site to create a vibrant and attractive office environment.
Wythenshawe Hospital is a major acute teaching hospital in South Manchester and is part of the University Hospital of South Manchester NHS Foundation Trust.
Braidburn Court is a McCarthy & Stone (UK’s leading retirement housebuilder of privately owned property with over 50,000 apartments nationwide) new-build development of 48 one and two bedroom Retirement Living apartments in Liberton.
Phase One of Exchange Square in Birmingham city centre is a stunning development of three tall buildings, offering over 60 luxury apartments, plus a 5,000 sq ft residents’ hub and prime retail and leisure space.
IKO PLC have provided 4000m² of primary waterproofing for a commercial office space project to waterproof plant areas and roof terrace space.
Airbus PLC required a completely flame-free installed system. Improvement was necessary to improve roof and gutter surface water clearance. The head office provided a challenge due to the amount of roof mounted pipework. Due to the housing of sensitive contents – vibration and noise as well as disruption had to be kept at a minimum.