IKO enertherm ALU Insulation Tapered Drainer Board
IKO enertherm ALU PIR Tapered Drainer Board is a multi-functional 100% CFC, HCFC or HFC-free insulation board with a rigid polyisocyanurate foam core, clad on
IKO enertherm ALU PIR Tapered Drainer Board is a multi-functional 100% CFC, HCFC or HFC-free insulation board with a rigid polyisocyanurate foam core, clad on
IKO enertherm ALU PIR Insulation Board is a multi-functional 100% CFC, HCFC or HFC-free insulation board. It has a rigid polyisocyanurate foam core, clad on
IKO enertherm ALU Insulation Angle Fillets are to be used at all horizontal and vertical abutments. They need to be adhered and bonded in IKO
Yes, IKO enertherm Cavity Wall PIR Insulation can be used in masonry external walls. However, there should always be a 50mm residual cavity. Never use
Pupils at Clarksfield Infants & Junior School in Oldham can be taught on their school roof thanks to the donation of a free green roof from IKO PLC.
Dorset House, Bournemouth University, Poole Brief Dorset House sits at the heart of Talbot Campus, where most of the undergraduate and postgraduate courses are delivered
As part of the drive to revitalise Kirkby Town Centre, the local authority, Knowsley Metropolitan Borough Council, has been significantly investing in regeneration works. A redundant B&M shopping centre formed an important part of the uplift. At 36,000 sq ft, the empty precinct was the largest vacant unit in the town centre and was in need of significant repair and modernisation. Bringing the building up to date was crucial in encouraging businesses back to the area and delivering more choice of retail outlets to visitors.
Epping Gate is an impressive development of 1, 2 and 3-bedroom apartments in Essex. It is located close to the Epping Forest Spread, within the desirable ‘Golden Triangle’ of Loughton, Buckhurst Hill and Chigwell. Spread over three blocks measuring between 3-5 storeys, the development was designed to accommodate 97 private and 42 housing association units, a podium garden and undercroft and surface car parking.
IKO and Sheriff Construction worked together to come up with a solution to the PVC SVP issue – a metal sleeve detail. This ensured that the pipes could be sealed, without risk of heat damage from the hot melt system.
Home / Sustainable roof systems / IKO Elements bio solar roof systems IKO Elements bio solar roof systems The IKO Elements bio solar roof system