Search
Search
Search

IKO PLC (UK) delighted to win three 2024 RIBA Awards

Photograph of the completed IKO roofing system at Battersea Power Station which won one of the 2024 RIBA Awards

IKO PLC (UK) is thrilled that 3 of our projects have been named winners of 2024 RIBA Awards. These latest winners are a welcome addition to an already successful award season for IKO, having won seven prestigious awards from reputable industry governing bodies, including the National Federation of Roofing Contractors (NFRC), the Single Ply Roofing […]

Culham Science Centre – IKO ULTRA Gold 20

Photo of the completed Culham Science Centre IKO ULTRA Gold 20 roofing system installation

Amber and IKO worked together to deliver a sensitive scheme for a new client. Located in the Culham Science Centre, the UK Governments research facility for Fusion Energy.

Home Height House – IKO ULTRA Gold 20

Photo of the Hatton Hall, Wellingborough IKO ULTRA Life 30 roofing system

Following several reported roof leaks IKO were chosen to survey the Academy roofs and recommend a proposal for renewing the aged and weathered membrane this included many non-compliant and fragile roof lights.

Walkwood Academy – IKO ULTRA Gold 20

Photo of the completed Walkwood Academy, Redditch roofing system

Following several reported roof leaks IKO were chosen to survey the Academy roofs and recommend a proposal for renewing the aged and weathered membrane this included many non-compliant and fragile roof lights.

St Edmunds Catholic Academy – IKO ULTRA Prevent 25

Photo of the completed St Edmunds Catholic Academy IKO ULTRA Prevent 25 roofing system

IKO worked with Brindley Asphalt on this school. The school has 900 pupils, works including replacing the defective waterproof covering, incorporating new tapered insulation to current building regulations and creating a falls to remove the drainage of the surface water.

Villiers Primary School – IKO ULTRA Gold 20

Photo of the completed Villiers Primary School IKO ULTRA Gold 20 roofing system

IKO Technical representatives carried out a full roof survey of the flat roof areas of the school and carried out a number of cores samples upon each area to ascertain the existing waterproofing build-up.

Should I use adhesive or nails when constructing a super shed?

No image available placeholder graphic

What size clout nails should I use? Clout nails should be 15mm large head clout nails. I will also need to overlap the felt, how much overlap should I use? Overlaps will typically be minimum 50mm and will depend upon the slope of the roof. On shallow sloped roofs, we would suggest the overlap is […]