Search
Search
Search

Lanthorn Community Centre, Livingston – IKO Mach Two

Photo of the Lanthorn Community Centre, Livingston IKO ULTRA Mach Two roofing system

Working in partnership with construction firm, GMG Contractors, IKO has helped to boost the thermal and waterproofing performance of Lanthorn Community Centre in West Lothian. Located in the Dedridge area of Livingston, this large facility hosts a wide range of local events and adjoins a church building.

Ixworth Place, London – IKO Goldseal

Photo of Ixworth Place, London

Southern Housing Group required a solution to an ageing flat roof on Ixworth Place, a prestigious residential property close to Chelsea in London, built in 1912.

Portslade Academy, Brighton – IKO Ultra Prevent

Photo of the Portslade Academy, Brighton IKO ULTRA Prevent roofing system

Portslade Aldridge Community Academy is based in the heart of Portslade, Brighton. The secondary school and Sixth Form specialises in Sports, Science, Media and Entrepreneurship. There has been significant development of the site over recent years and includes a new community library and a Science Technology Engineering and Mathematics (STEM) Centre.

Wolverhampton University – IKO Ultra Prevent

Photo of the Wolverhampton University IKO ULTRA Prevent system

WA Building is the main student hub at University of Wolverhampton’s Walsall Campus, which specialises in Education Health & Wellbeing and Performing Arts courses. The WA Building houses the refectory and café lounge, student support and campus Facilities Management.

Ele House University, Hertfordshire – IKO Ultra Prevent

Photo of the Ele House University, Hertfordshire IKO ULTRA Prevent system

As part of the refurbishment programme, the existing roof on Ele House University was ponding and in great need of repair. The roof is mostly flat but has four large, pitched roof areas and two smaller pyramidal roof areas housing water tanks.

Cherwell School, Oxford – IKO Ultra Prevent

Photo of the Cherwell School, Oxford IKO ULTRA Prevent system

Cherwell Secondary School in Oxford is a high-profile project in a prominent setting. IKO were given complete responsibility for the specification and planning of the building’s 2000m² flat roofing system.