Project description

IKO Permatec Hot Melt Waterproofing System has been specified and installed onto the roofs of three residential apartment blocks in South East London.

The versatile and durable system was applied onto 1,500m2 of roof area at Orchard Lodge – a new housing complex developed by Fairview New Homes Ltd on the outskirts of the city centre.

Essex-based contractors, Contour Roofing Ltd, undertook months of planning as well as product training with IKO to ensure its team was confident in the quality and safe application of the hot melt system.

Despite specifying other IKO PLC products previously, this was the first time they had used this particular waterproofing solution.

Photo of the Orchard Lodge, South East London IKO Permatec Anti-Root system
Photo of the Orchard Lodge, South East London IKO Permatec Anti-Root system

Solution and installation

Firstly, Contour Roofing Ltd applied IKO Permascreed to the cambered pre-cast concrete planks on the roof areas. Designed to provide drainage falls, IKO Permascreed also offers a stable base for the specified waterproofing system. A purpose-built 18 tonne hot charge transporter delivered IKO Permascreed direct to the site ready for use.

The flexibility and fast drying times of the IKO Permascreed System was ideal for this new build project, as a quick installation was vital to ensure internal trades could access the new apartments to complete their works, so they were ready on time for the new residents.

Then, the first coat of IKO Permatec was applied, followed by a reinforcement layer before the second coat of IKO Permatec was installed.

An IKO enertherm EPS Insulation layer was also used, which is suitable for use on green roofs and A+ rated in the BRE Green Guide. Coupled with IKO Permascreed Mastic Asphalt Levelling Solution, IKO Permatec Waterproofing System formed the ideal base for a sedum green roof finish, which was supplied and installed by Sky-Garden.

Jonathan Woods, managing director at Contour Roofing (Essex) Ltd, said: “The success of this project goes far beyond the installation of a quality product on site, but also the months and long hours of planning and health and safety training to ensure we were fully verified and qualified in installing this quality hot melt solution.

“Thanks to this hard work and training, we now have full confidence in both the IKO Permatec Waterproofing System and IKO Permascreed Mastic Asphalt levelling solution and are able to deliver to the highest standards of quality, and most importantly, safety.”

“Our IKO Permatec Hot Melt System offers a highly durable solution, providing excellent waterproofing performance with toughness, flexibility and adhesion over a wide range of temperatures.

“Choosing IKO Permascreed provided an ideal addition to the overall waterproofing solution as the special mastic asphalt formulation delivers a fast-drying time, making the roof or deck trafficable much faster than traditional cement screeds.

“The programme on site was much more streamlined because of this and it minimised any significant delays to other trades.”

Marcus Lee – Sales Director, IKO PLC

Photo of IKO Sales Director Marcus Lee

“The project was completed on time and within budget to a really high standard – everyone was extremely impressed of how quickly the roofs were finished. The ease of application of the IKO Permascreed also meant that precise falls were easy to achieve and the IKO Permatec roof finish could be applied within a few hours of installation.”

Joe McCanna – Contracts Manager, Contour Roofing